久久久久成人国产av_日韩最新一区二区三区四区_国产蜜芽tⅴ在线视频_婷婷综合激情亚洲狠狠首页_国产亚洲午夜电影_日本丰满老熟妇oldwoman_最近最新免费视频_日韩有码中文字幕在线观看_午夜精品福利久久_苍井空视频免费在线观看

Wafangdian Guangyang Bearing Group Co., Ltd.

Home >> Industry News

Contact Us

Tel:400-0058-999
Add:No. 2200, Section 3, South Street,Wafangdian City, Liaoning Province, China
Tel:0411-85647733
Fax:0411-85647666
Website:xmwss.cn

Industry News

ACCIONA Energía Launches Massive Wind Farm in Mexico

Release Time:08 Feb,2017

The Ventika project, located in the municipality of General Bravo, was built by ACCIONA under an EPC contract for a group of investors including Blackstone Energy Partners, Fisterra Energy and CEMEX. With an estimated output of 1,000 GWh a year, the Ventika complex will cover the electricity demand of more than 630,000 homes. ACCIONA Energía carried out the engineering, construction and supply of wind turbines for the complex and it will undertake its operation and maintenance for 20 years. ACCIONA’s execution of the project, completed ahead of schedule, received two CEMEX construction prizes for its innovative nature and excellence in construction. The Ventika project consists of eighty-four AW116/3000 wind turbines of Nordex/ACCIONA Windpower technology. With a nominal capacity of 3 MW, each turbine has a 116-meter-diameter rotor installed on a 120-meter (hub height) concrete tower. One innovative feature entailed using concrete towers for the first time in the Mexican wind power sector. The 1,848 sections of the wind turbine towers were assembled at a plant near Monterrey. The project required more than 388 kilometers of underground cables to carry the generated power, and 54 kilometers of access tracks to the turbines. An average of 420 people was employed during the construction of the complex, with peaks of up to 850 people at times of intense activity.
|
Quick links
Follow Us

Mobile Website

Wechat Platform

GroupMore

Wafangdian Guangyang
Bearing Group Co., Ltd.

Equipment & Capability

Copyright@2017Wafangdian Guangyang Bearing Group Co., Ltd.